Werner Exinger wrote:
Mike Armstrong wrote:
Very strange indeed. The symbolic processor is identifying the unit and then stripping it by dividing by the base SI unit. Most certainly a big and need reporting.
Guess the problem is the Excel component, not the symbolic proc.
Maybe, but the numerical proc evaluates correctly, so it must lie with the interface between the component and symbolic proc.